Recommended: Dispatch a qualified HVAC technician to free the valve and verify supply-air recovery before closing the incident.
Miraya
Concept · design-partner stage
Concept experience · illustrative synthetic data
A guided, vertical story for smaller screens. Open on a larger screen to explore.
Miraya concept ready. All operations data is illustrative and synthetic.
Chapter 1 · One operational picture
City KPI tree
Illustrative synthetic scores · select to recolour the cityStakeholder lens
One model, seven operational viewsSee estate-wide performance, risk and spend against the targets leadership has set.
Operational district
3D city model: Helsinki LoD2 geometry © City of Helsinki, CC BY 4.0 (hri.fi) · Composite scene: interiors are illustrative and not located in Kalasatama · Operations data is synthetic.
Key insights
Plain-language findings, with the evidence kept attached.
Recommended: Inspect condenser-water approach and refrigerant charge before revising the chiller sequence.
Recommended: Approve a schedule correction for the six zones and verify the next five occupied mornings for comfort drift.
Recommended: Isolate W-3 one branch at a time and inspect the level-8 flush valve identified by the last pressure step.
Recommended: Check DC string 2 for connector heating and compare its current with string 1 before replacing hardware.
Recommended: Schedule a door-operator inspection before Friday’s peak and keep L3 available as the accessible alternative.
Recommended: Confirm the door is secure, preserve the event clip and review the contractor’s access instructions.
Recommended: Open two South entrance lanes, move four marshals to North entrance and send wayfinding before doors open.
Every insight carries its evidence.
Insight order updated. Top finding: AHU-TB-12-04 cannot reach its supply-air setpoint because its cooling valve is likely stuck..Steer toward a −15% energy target
Move the target. Insight ranking recalculates against the active KPI, bringing newly relevant findings into view.
Ask the city
Chiller plant 2 and AHU-TB-12-04 explain the largest avoidable loads in this synthetic scenario. The ranking follows weather-normalised drift and your current sustainability target.
Sustainability, attributed
Normalised for weather; traceable from meters to serving assets.
- Water intensity
- 96 L/occupant·day
- Waste diversion
- 64 %
- Solar yield
- 18.4 MWh this month
- Scope 1+2 emissions
- 4,820 tCO₂e/yr