Forced door, nearest camera, occupancy and guard roster.
The object graph adds zone context and the on-shift responder before dispatch, with every action timestamped.
Concept · design-partner stage
Concept experience · illustrative synthetic data
A guided, vertical story for smaller screens. Open on a larger screen to explore.
Miraya concept ready. All operations data is illustrative and synthetic.
Chapter 3 · From points to objects
| Incident | Status | Priority | Owner | SLA |
|---|---|---|---|---|
| Verified | P2 | Synthetic technician · T-17 | 36 / 90 min | |
| On site | P1 | Synthetic guard · G-08 | 9 / 30 min | |
| Triaged | P2 | Synthetic event lead · E-06 | 28 / 480 min | |
| Detected | P2 | Unassigned | 4 / 240 min | |
| Dispatched | P3 | Synthetic lift technician · L-11 | 20 / 1440 min |
Two occupied work zones are losing comfort; no life-safety system is affected. Owner: Tower B mechanical response.
TB12.SAT19.8 °CSupply-air temperature highTB12.CWV100 %Cooling valve command saturatedTB12.ZT-03+2.7 °CZone-temperature deviationMeanwhile, warmer return water increases plant load and the first comfort complaint arrives in a separate system.
Cooling output diverged from valve command across three consecutive observations.
TB12.SAT, TB12.CWV and TB12.ZT-03 bound to AHU-TB-12-04; zones 12-A and 12-B resolved.
P2 priority derived from two occupied zones and the affected cooling service.
Nearest qualified technician selected from the illustrative live roster; evidence and asset history attached.
Affected space owners received the scope and 10:45 illustrative ETA before a complaint was logged.
Valve travel checked from 0–100%; feedback tracked command within ±3%.
Supply-air temperature recovered to 14.2 °C and command fell to 62%; the 14-minute verification window passed.
The object graph adds zone context and the on-shift responder before dispatch, with every action timestamped.
A second lane, marshal roster and live crowd context become one pre-emptive operating plan. Illustrative synthetic forecast.