Recommended: Approve a schedule correction for the six zones and verify the next five occupied mornings for comfort drift.
Unaccounted water if flow continues: 28.8 m³/day · projected91% confidence
Recommended: Isolate W-3 one branch at a time and inspect the level-8 flush valve identified by the last pressure step.
Lost renewable generation: 1,720 kWh/week · estimated89% confidence
Recommended: Check DC string 2 for connector heating and compare its current with string 1 before replacing hardware.
Every insight carries its evidence.
Insight order updated. Top finding: AHU-TB-12-04 cannot reach its supply-air setpoint because its cooling valve is likely stuck..
How the platform adapts
Steer toward a −15% energy target
Move the target. Insight ranking recalculates against the active KPI, bringing newly relevant findings into view.
−5%−30%
Ranking updated · AHU-TB-12-04 cannot reach its supply-air setpoint because its cooling valve is likely stuck.
Scripted concept · canned answers
Ask the city
Answer · scripted concept
Chiller plant 2 and AHU-TB-12-04 explain the largest avoidable loads in this synthetic scenario. The ranking follows weather-normalised drift and your current sustainability target.
What is driving avoidable energy use today?Illustrative · relative trend
Resource intelligence · illustrative synthetic data
Sustainability, attributed
Weather-normalised
Energy use intensity118 kWh/m²·yr
Normalised for weather; traceable from meters to serving assets.
Energy attribution
Grid + solarSource
HVAC · lifts · lightingSystem
87% attributedAsset-level kWh
Water intensity
96 L/occupant·day
Waste diversion
64 %
Solar yield
18.4 MWh this month
Scope 1+2 emissions
4,820 tCO₂e/yr
Deterministic synthetic scenario · no live system connectedEvery insight carries its evidence